Hierarchy of controls drill for construction

Read a jobsite scenario, then rank four controls or pick the strongest one the job allows. See each control's level and the OSHA section behind it.

Original construction scenarios · 20 to work

Hierarchy of controls drill

How to use it ↓

Most to least effective: Elimination › Substitution › Engineering control › Administrative control › PPE.

Set 20261026 · 0 of 20 answered · 0 correct

Scenario 1 of 20 · Rank the controls

Dump trucks with an obstructed rear view deliver fill to an area where laborers on foot spread it. The current layout makes every truck back in. The site has room for a drive-through route, and barrier can be set along the walkways.

Rank these controls from most to least effective. Assume each one is feasible here.

Hint

Ask how to stop the backing, then how to keep people and trucks apart. Backing rules are in 1926.601(b)(4).

What is the hierarchy of controls? It is the order for choosing how to deal with a hazard, from most to least effective: remove it, swap it for something less dangerous, isolate people from it with equipment, change how the work is done, and last, protect the worker with gear. The higher levels work without anyone having to act. The lower ones depend on people every time.

Knowing the five names is the easy part. The harder call is placing a real control, such as a trench box, a spotter or a wet saw, at its level, and spotting when the job rules out the top choice. The hierarchy of controls guide explains each level with construction examples.

How to use the drill

Each set runs all 20 scenarios in a shuffled order, with the four controls shuffled too. A ranking scenario says every control is workable on that job, so rank them by level alone: give the most effective a 1 and the least a 4. A pick scenario says what the job rules out, such as an owner keeping skylights or a tool that does not exist, so cross those off and choose the highest level left. The hint points to the rule and the way to think, not the answer.

After you check an answer you see every control in order with its level and why it sits there, the idea the scenario teaches and the 29 CFR 1926 section that applies. The two lifting and posture scenarios have no single section, because Part 1926 has no ergonomics standard. At the end you get your score by hazard, your score by level and the guide to study for your weakest hazard. Hit New shuffle for a fresh order, and quote the set number if you report an error.

The five levels with construction examples

LevelWhat it doesConstruction example
EliminationRemoves the hazard or the need to be near itAssemble a frame on the ground instead of at a roof edge
SubstitutionSwaps in a less hazardous material, tool or methodCut steel with a cold saw instead of a torch near combustibles
Engineering controlIsolates people from the hazard with equipment that works on its ownGuardrail, trench box, wet saw, local exhaust, GFCI
Administrative controlChanges how, when or by whom the work is donePermits, spotters, rotation, inspections, training
PPEProtects one wearer while the hazard staysRespirator, hearing protection, harness

Worked example: masonry above a walkway

Bricklayers are working from a scaffold 20 ft above a covered walkway that staff use all day. The walkway cannot be closed, and a canopy can be fixed over it. Step 1: cross off what the job rules out. Closing the walkway or keeping the area below clear is out, because people have to pass, so the exposure cannot be removed. Step 2: take the highest level left. A canopy or debris net over the walkway is an engineering control that catches falling bricks and tools whether or not anyone notices, and 1926.451(h) calls for falling object protection for people below a scaffold. Step 3: place the rest. A spotter who warns pedestrians is administrative and depends on being seen and heard in time. Hard hats are PPE and do little against a brick from that height. For the soil and slope side of trenching, try the trench sloping calculator.

Three traps the drill is built around

  • A required control is not always the strongest. A confined space permit or a backing spotter can be the legal minimum and still rank below a design change that removes the exposure.
  • Two compliant options can sit at different levels. A GFCI and an assured grounding program both satisfy 1926.404(b)(1), but the GFCI acts on its own.
  • Feasible means on this job. When the top level is ruled out, the answer is the next level that can be done, not PPE by default.

Hierarchy of controls FAQ

What are the five levels of the hierarchy of controls?

From most to least effective: elimination, substitution, engineering controls, administrative controls and personal protective equipment. The top three work without anyone having to remember or choose to use them. The bottom two depend on people following a rule or wearing gear correctly every time, which is why they rank lower.

Why is PPE the last line of defense?

PPE leaves the hazard where it is and puts a layer between it and one person. It works only if it is the right type, fits, is in good condition and is worn the whole time, and it does nothing for anyone nearby without it. It is still needed when the controls above it cannot bring exposure down far enough.

What does strongest feasible control mean?

It is the highest level that can actually be used on this job. If the design, the owner or the work itself rules out elimination, you do not stop there and jump to PPE. You take the next level down that can be done, then add lower layers to cover what is left. Several OSHA construction rules, the noise, lead and silica rules among them, build that order in.

For the health rules behind several scenarios, read OSHA health hazards: silica, lead and noise, and for the open edge and skylight scenarios, fall protection under Subpart M.

20 original construction scenarios on silica, falls, noise, trenches, hot work, lead, confined spaces, struck-by, electrical and lifting. Half ask you to rank four controls, half ask for the strongest control the job allows. Every answer names each control's level, explains its place and cites the 29 CFR 1926 section by number where one applies.

Try one free question

Try one question

Question 1 of the free 10-question check on CHST. No signup.

Question 1 of 10 · free checkUntimed

Emergency Preparedness, Incident Investigation, and Response

On a building under construction, what is the longest allowed travel distance from any point of the protected area to the nearest fire extinguisher?

Choose an answer to begin

Free CHST study plan

A week-by-week plan from today to your exam, weighted to the published exam outline. We show it here and email you a copy.

Ask Kick before you buy AI your Toe Board study buddy

See what's on the CHST exam, test yourself with 5 quick questions, or find the plan that fits you.

Sources

Preparing for the CHST?

You just worked 20 construction scenarios through the hierarchy. The free 10-question check scores you by CHST domain in minutes, no signup, so you know what to study first. The Toe Board course then adds a lesson for each domain and full-length timed practice exams.

Take the free 10-question check

By the Toe Board editorial team. Report an error with the set number and scenario number.

Add this drill to your site

Copy the HTML with its attribution link. The iframe scrolls through the drill and the guide below it; no external script is needed. The host must allow this page to be framed.