The rule in plain words
The tipping rule is 29 CFR 1926.451(c)(1), for supported scaffolds. Height is measured against the base width, counting outrigger supports if used. We give the rule in our own words; read the paragraph itself for the exact text.
- Ratio = height ÷ base width. Restraint by guying, tying, bracing or an equivalent means is required when the ratio is more than 4 to 1, (c)(1). Exactly 4 to 1 does not trigger it.
- First tie at 4 × base width. That is the 4:1 height. The tie goes at the closest horizontal member to it, or where the manufacturer says, (c)(1)(ii).
- Repeat every 20 ft or less for a base 3 ft wide or less, every 26 ft or less for a wider base. Each repeat is at a horizontal member, (c)(1)(ii).
- Top tie no further than the 4:1 height from the top. So the highest tie is at or above height minus 4 × base width, (c)(1)(ii).
- Ties at each end and every 30 ft or less along the length. The 30 ft is measured from one end toward the other, (c)(1)(ii). Ties per level = length ÷ 30, rounded up, plus 1.
- Placement. Ties go where horizontal members support both the inner and outer legs, (c)(1)(i).
- Capacity. In general, each scaffold and component must support its own weight and at least 4 times the maximum intended load, 1926.451(a)(1); exceptions are in (a)(2) to (a)(5) and (g). The calculator multiplies your load by 4, so enter the load in the unit you want back.
Ties are also required, whatever the ratio, wherever an eccentric load such as a cantilevered work platform acts on a supported scaffold, (c)(1)(iii).
Worked example 1: 40 ft high on a 5 ft base
Ratio = 40 ÷ 5 = 8:1, which is more than 4:1, so restraint is required. The 4:1 height is 4 × 5 = 20 ft, so the first tie is at 20 ft. The top tie must be at or above 40 − 20 = 20 ft, and the first tie already is, so one level is enough. On a 30 ft long scaffold that is 30 ÷ 30 = 1, plus 1, so 2 ties.
Worked example 2: 60 ft high on a 5 ft base, 70 ft long
Ratio = 60 ÷ 5 = 12:1. First tie at 4 × 5 = 20 ft. The base is wider than 3 ft, so the next level is within 26 ft of the first, at 46 ft or below. The top tie must be at or above 60 − 20 = 40 ft, and 46 ft is, so two levels do it. Along 70 ft: 70 ÷ 30 = 2.33, rounded up to 3, plus 1 is 4 ties per level, so 8 in all. With a 500 lb intended load, the capacity needed is 4 × 500 = 2,000 lb.
Worked example 3: why 3 ft and 3.1 ft differ
The spacing switches at a 3 ft base. A 3 ft wide scaffold 80 ft high has its first tie at 12 ft, then every 20 ft or less: 32, 52 and 72 ft or below, and the top tie must be at or above 80 − 12 = 68 ft. A 3.1 ft wide scaffold of the same height has its first tie at 12.4 ft, then every 26 ft or less: 38.4 ft, 64.4 ft, and then the top. The sizes are invented. These are original arithmetic examples, not exam questions.
How this shows up in CHST study
The CHST blueprint covers working at heights in its first domain, so it is worth knowing which number applies. Be able to say that 4:1 is the trigger for restraint, that the first tie goes at 4 times the base width, that 20 and 26 feet depend on whether the base is 3 feet wide or less, and that capacity is a factor of 4 on the intended load. See the scaffolds (Subpart L) guide for the rest of Subpart L, the ladder angle calculator for the other 4 to 1 rule, and the fall protection (Subpart M) guide.
Scaffold tie questions
Is a scaffold at exactly 4:1 tied?
Not under 1926.451(c)(1). That paragraph requires restraint when the height to base width ratio is more than four to one, so exactly 4:1 does not trigger it. The manufacturer's instructions can still call for ties, and (c)(1)(iii) requires ties, guys, braces or outriggers whenever an eccentric load such as a cantilevered platform acts on the scaffold.
Does the base width include outriggers?
Yes. Paragraph (c)(1) measures height against the base width including outrigger supports, if used. Enter the width at the ground that includes them. Our suggestion, not the rule: use the narrowest base the scaffold has.
Where does the first tie go?
At the closest horizontal member to the 4:1 height, or where the manufacturer's recommendations place it. The 4:1 height is four times the base width. The calculator shows that height as the highest the first tie can sit, because a tie goes at a horizontal member.
Does this apply to mobile scaffolds?
Mobile scaffolds have their own paragraph, 1926.452(w). This tool applies the supported scaffold rule in 1926.451(c)(1) and does not replace it. Read paragraph (w) for a mobile scaffold.