OSHA excavations (Subpart P) for the CHST
A trench can fail in seconds and workers rarely get a second chance, which is why excavations get their own line in the CHST blueprint. Subpart P (29 CFR 1926.650 to 1926.652) is short, and its numbers are specific. This guide maps them in our own words, without reproducing the standard.
Check anything you rely on against your own licensed code book and the edition your AHJ enforces.
Where Subpart P sits in the blueprint
Excavations are item 3 in the Domain 1 knowledge list, and Domain 1 is 36.6% of the CHST. Expect questions on protective systems, the competent person and the conditions that change the answer, such as water or traffic.
The sections to know
- 1926.650 gives scope and definitions: trench, excavation, competent person, protective system, shield.
- 1926.651 holds the general requirements: locating underground utilities before digging, keeping spoil and equipment back from the edge (the figure is 2 feet), a way out of any trench 4 feet or deeper within 25 feet of lateral travel, testing the air where a hazardous atmosphere could exist, controls for accumulated water, and a competent person's inspection daily and after anything that changes conditions, such as rain.
- 1926.652 requires protection from cave-ins. Protection is needed unless the excavation is in stable rock, or is under 5 feet deep and a competent person finds no sign of cave-in. It then offers the choices: sloping and benching, support systems, or shield systems. The soil classification and slope tables are in Appendices A and B.
Try one question
Question 1 of the free 10-question check on CHST. No signup.
Emergency Preparedness, Incident Investigation, and Response
On a building under construction, what is the longest allowed travel distance from any point of the protected area to the nearest fire extinguisher?
Choose an answer to begin
Soil classification
The competent person classifies soil as stable rock, Type A, Type B or Type C, with Type C the weakest. Visual and manual tests decide it, and Appendix A describes them. Soil that has been disturbed before, or that sits in a trench with water, usually falls toward the weaker types. The slope you may use depends on the type, so a wrong classification is a wrong slope.
What the competent person does
Inspects before work and as conditions change, classifies the soil, chooses the protective system, and removes workers when there are signs of a hazard. Under 1926.651(k) the inspection is a duty, not a courtesy.
Common mix-ups
- 4 feet and 5 feet are different triggers. Four feet drives egress and atmosphere testing. Five feet drives the protective system rule.
- A spotter is not a protective system. Neither is a short work time.
- Spoil belongs back from the edge. Piles at the lip add load and fall onto workers.
- Shields protect workers inside them. They do not prevent a cave-in outside the shield.
How to practice
Draw a trench and label depth, soil type, water, spoil and egress. Then ask which rule each feature triggers. Work questions that describe a changed condition and ask what the competent person does next.
Related guides: fall protection (Subpart M) for edges and confined spaces (Subpart AA), since some excavations and trenches become confined spaces.
Practice it
Take the free 10-question check. It covers the four CHST domains, needs no signup and explains every answer, so you see whether this subpart is a weak spot. The CHST study guide shows where it fits in a six-week plan.
Not affiliated with or endorsed by BCSP.
Sources
Show the list
- 29 CFR 1926 Subpart P, Excavations, OSHA.
- CHST Examination Blueprint (CHST5, V.2022.04.12), Board of Certified Safety Professionals.
Ready to see where you stand on CHST?
Free, untimed and scored by domain. No signup.
Start the free 10-question checkFacts checked 24 October 2026 against the sources listed above. If something has changed, tell us and we will correct it within 2 business days.
Test yourself on this domainTake a free check weighted to the published outline and see your score by domain.
Your next step
- 01Free CHST check10 questions, untimed, about 12 minutes. Answers explained as you go.Start free
- 02Free sample lessonFall protection on a construction site: a full lesson from the course, plus 5 practice questions with explanations.Read the sample
- 03CHST course$149. Lessons, timed practice exams and a plan around your exam date.See the plans
The CHST course
Available now · instant accessLearn each CHST blueprint domain, then prove it on a full-length timed practice exam.
- 4modules of lessonsEvery task on the outline
- 1full-length timed exams200 questions in 240 minutes each
- 300practice questionsEach one explained
- 1week-by-week study planSet to your exam date
Turn a practice answer into a study step. In untimed practice, ask Kick AI about any question you answer, follow up, then see your weakest topics and what to drill next.
Every answer comes with a full explanation.